- Overview
- Products Description
- Certifications
- FAQ
- About Us
- Packing and Shipping
Basic Info.
Model NO.
AF-DC-7KW
Location
Private Use
Number of Charging Interfaces
One Pile with One Charge
Start Mode
RFID Card
Protection Level
IP54
Input Voltage
380V/AC 15%, 200V-750V
Output Power
30kw/45kw/60kw/75kw/90kw/120kw/150kw, 7kw-30kw
Guns
One
Output Current
DC
Feature
Charging Pile
MOQ
1PCS
Name
EV Charger
Quality
Good
Style
Electric Car Charger
Cable Length
5m
Interface Standard
CCS1, CCS2, GB/T
Trademark
AMPPAL
Origin
Zhejiang, China
Product Description








product name | Portable DC Charging Station | | | ||
model | AF-DC-7KW | AF-DC-15KW | AF-DC-20KW | ||
Dimensions (mm) | 345*175*265 | 540*375*195 | 540*375*195 | ||
User Interface | Digital tube, LED | | | ||
The output voltage | 200V-450V | 200V-700V | 50V-550V | ||
power factor | ≥0.99 (above 50% load) | | | ||
HMI | LED indicator | | | ||
working environment | Altitude: ≤3000m; Temperature: -20~+50; | | | ||
charging method | Swipe card, scan code | | | ||
Networking | 2G, 4G, Wifi, applet | | | ||
input frequency | 45~65Hz | | | ||
Protective function | Overvoltage, undervoltage, overcurrent, short circuit, surge, leakage, etc. | | | ||
charging interface | GB/T 20234.2-2015 | | | ||
long charging cable | Standard 5 meters (optional) | | | ||
Protection class | Ip54 | | |










What is your terms of payment? |
A: online fast payment, T/T |
Do you test all your chargers before shipping? |
A: All major components are tested before assembly and each charger is fully tested before shipped |
Can I order some samples? How long? |
A: Yes, and usually 7-10 days to production and 7-10 days to express. |
How long to fully charge a car? |
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours. |
Are you Trading Company or manufacturer? |
A: We are professional EV charger manufacturer. |


